The Loch Ness Cove Property Owners Association (POA) is actively working to preserve and improve our neighborhood park through a multi-phase initiative focused on shoreline protection, stormwater management, and long-term sustainability. Each phase targets critical infrastructure along the boat launch and shoreline areas, with progress dependent on both professional assessments and available funding.

 

We’re excited to share the latest progress on our multi-phase improvement project focused on stabilizing erosion and repairing bulkheads around the boat launch area. These efforts are essential for preserving the long-term safety, usability, and appearance of our community park.

โ€‹

โ€‹

โœ… Phase 1: Stormwater Drainage Repairs

Status: โœ… Completed – September 20, 2025
Objective: Repair and replace defective stormwater drainage on the south side of the boat launch that was contributing to erosion and weakening the adjacent bulkhead.

Scope of Work Completed:

  • Full assessment of existing drainage issues

  • Replacement of collapsed drainage systems

  • Restoration of proper water flow

โ€‹

โ€‹

โ€‹

๐Ÿงฑ Phase 2: Bulkhead – South Side of Boat Launch

Status: ๐Ÿšง In Progress
Objective: Stabilize and partially repair the compromised bulkhead impacted by erosion and prior drainage failure.

Scope of Work:

  • โœ” Assess damage and finalize repair strategy (in progress)

  • Finalize assessment and develop repair plan

  • Source funding

  • Hire qualified contractor

  • Backfill and restore the surrounding property

Next Steps:

  • Continue planning and coordination

  • Begin acquiring needed materials

  • Organize work crews and support

โ€‹

โ€‹

โ€‹

๐Ÿ› ๏ธ Phase 3: Bulkhead – North Side of Boat Launch

Status: โณ Not Started
Objective: Replace the bulkhead on the north side of the boat launch following the completion of Phases 1 and 2.

Scope of Work:

  • Finalize assessment and develop repair plan

  • Source funding

  • Hire qualified contractor

  • Backfill and restore the surrounding property

โ€‹

โ€‹

โ€‹

๐ŸŒฒ Phase 4: Bulkhead – Far North Side of the Park

Status: โณ Not Started
Objective: Replace the steel bulkhead at the park’s far north side with a wood structure for greater durability and consistency with other repairs.

Scope of Work:

  • Finalize assessment and develop repair plan

  • Source funding

  • Hire qualified contractor

  • Backfill and restore the surrounding property

Next Steps:

  • Continue sourcing funds through grants and donations

โ€‹

โ€‹

โœ… Want to Get Involved?

Residents can play a vital role in supporting this park improvement effort!

Ways to contribute:

  • ๐Ÿงค Volunteer your time

  • ๐Ÿงฑ Donate materials, services or funding

  • ๐Ÿ’ฐ Support local fundraising efforts

๐Ÿ“ง Contact the POA to learn more about how you can help improve and preserve our park for future generations.

bottom of page